Contact

Post:

AERONAUTICAL INFORMATION SERVICES
CIVIL AVIATION AUTHORITY OF MALAYSIA
NO. 27, PERSIARAN PERDANA
LEVEL 1-4, PODIUM BLOCK, PRECINCT 4,
62618 PUTRAJAYA
MALAYSIA

Tel: 6-03-8871 4000

Fax: 6-03-8881 0530

AFS: WMKKYAYS

Email: ais@dca.gov.my

URL: aip.dca.gov.my

AIP Supplement for Malaysia

AIP SUP

11/2018

Effective from 25 DEC 2018

to PERM

Published on 26 NOV 2018

  KOTA KINABALU FLIGHT INFORMATION REGION
PROPOSED CONSTRUCTION OF SIMPLE APPROACH LIGHT SYSTEM AT
KUCHING INTERNATIONAL AIRPORT, KUCHING, SARAWAK.

1  INTRODUCTION

1.1  This AIP Supplement serves to notify the aviation industry of the New Simple Approach Light System at runway 07, Kuching International Airport, Kuching, Sarawak.

1.2  All works are expected to be completed by 24 December 2018.

1.3  The scope of works for the upgrading works include the Earthworks, Perimeter road, Perimeter and security fencing, Substructure, Cabling and Simple Approach Light at runway 07.

1.4  The construction of Simple Approach Light at runway 07 will serve the aircraft for landing through runway 07.

2  SCOPE OF CHANGE

2.1  Appendix A attached shows the changes to the airfield facilities as tabulated in WBGG AD 2.14 – Approach and Runway Lighting.

2.2  Appendix B attached shows the changes to the Aerodrome chart (AD 2-WBGG-2-1).

3  IMPLEMENTATION

3.1  This AIP Supplement and relevant charts are expected to be effective at 0000 UTC on 25 December 2018. A trigger NOTAM will be issued to alert users on the implementation.

4  CANCELLATION

4.1  This AIP supplement will remain current until the information is published in AIP Malaysia.

-end-



Figure 2. APPENDIX B - AERODROME HELIPORT CHART - ICAO
PDF../graphics/142286.pdf